Thursday, 31 March 2011

Sixth & Seventh Day Editing


For the sixth day of editing, we all worked together for two hours taking it in turns controlling the mouse on Final Cut. We got a lot done this session as we all worked hard and were honest if we didn’t like something / didn’t think something was quite right. I believe this is good because we have started communicating a lot more and working together as a group more.

Seventh day editing went well as well, we all worked on the credits together deciding what should go where etc. Although we didn’t manage to put the credits in on the same session, we will hopefully put them in soon. Harry finished the soundtrack which turned out to be really good, but due to changing some shots and sequences, we still hope it will fit in with the alleyway shots.

Fifth Day Editing


Fifth day editing went well, but we didn’t edit much as we all decided to work on bits and pieces each. I updated the group blog, while Ella worked on the beginning of the credits with Alex and Harry finished the soundtrack.

Fourth Day Editing


For the fourth day editing we had 2 hours to do some editing. We decided on Harry carrying on with the soundtrack to which we all kept getting updated by listening to it every half hour. Alex did some editing by putting more of the shots together while me and Ella worked on the group blog for an hour. For the second hour, Ella and myself did some editing on Final Cut to which we started cutting the shots / scenes and putting them together from  the beginning while Harry worked on the soundtrack and Alex worked on the production logo.

Third Day Editing


Third day editing didn’t go too well as we only had an hour to edit to which we didn’t really get anything done to be honest. Myself and Ella concentrated on getting a few more of the clips together on Final Cut, while Alex started work on the production logo and Harry started making the soundtrack for the alleyway scene. The fact that myself and Ella work very well together means that we can get a lot done between both of us working together.

Second Day Editing


Second day editing, I feel like we got a lot done. We all worked together this time and decided on sequences that should be added in and taken out. This worked well as we had more to work from with the alleyway shots completed. We all learnt how to properly use Final Cut to which we did get a lot of work done.
We put the first few alleyway shots together to which it wasn’t done proper, but so we had a rough idea of where we were and what we needed to do for the next editing session.

Zombie Land - Opening Sequence


Director; Ruben Fleischer

Narrative Function
  • No intentional straight away
  • Humorous
  • Genre – horror
  • Gives an idea of the film, but not completely
  • Tells us it’s in America

Conventions Displayed
  • Credits given through music and slow motion shots

Characters Introduced
  • Hear Jesse Einsenberg – plays characters called Columbus

Technical Codes
  • Shows buildings – sets setting
  • Wording used – 18+
  • Entertainment by words and shorts and characters
  • Shots show its going to be an interesting and action film
  • Upside down camera – shows how the world as it is
  • Fade to black before titles
  • Rock music – sets scene and movie